Energy & Power
>
Scope: Fabricated gas transmission piping with in-house pressure testing
Location: Fabricated in-house, shipped to site
Weld Procedures: API 1104
Completed: September 2009
>
Scope: Corn-oil extraction skid package with pipe fabrication, controls and insulation done in-house
Location: Fabricated in-house, shipped to North Dakota
Weld Procedures: Tig and mig
Completed: October 2009
>
Scope: Fabricated skid package with pressure vessels and in-house installed controls
Location: Fabricated in-house, shipped to Indiana
Weld Procedures: ASME Section 8, U stamp
Completed: September 2009
Covert Power Generating Station: Covert, MI
Metro Health Central Utility Plant: Wyoming, MI
Wolverine Power: Hersey, MI
GR Community College Energy Center: GR, MI
Steelcase Energy Center: Grand Rapids, MI
Zeeland Mirant Power Station: Zeeland, MI